Passive fire protection & firestopping
Protect the continuity of fire compartments around pipes, cables, joints and technical enclosures. We help define an executable package around the specified tested systems, coordinated openings and inspection records.
Work scope details ↓
We review the opening register, substrate, service type and specified fire compartment requirements. The package covers coordination of wall and slab penetrations, perimeter joints and technical enclosures. We organise material traceability, installation sequencing and access for inspections. Each location is recorded before closure; deviations are referred to the responsible designer and the agreed system documentation.
What helps us prepare your proposal Fire strategy, opening schedule, service types and required performance.
Four technical applications

01 · Firestopping at pipe penetrations
Delivery method
Identify the pipe material, diameter, insulation and required compartment rating. Prepare the opening and install the specified tested seal with the correct depth, annular space and support arrangement.
Quality control
Confirm approved system reference, penetration dimensions, surface preparation, labelling and photographic evidence before concealment.

02 · Cable-tray and cable-bundle penetrations
Delivery method
Coordinate tray layout and cable fill before closing the compartment. Use a documented system suitable for future changes and the specified wall or slab.
Quality control
Inspect support spacing, seal continuity, permitted fill ratio and identification of the sealed opening.

03 · Linear fire-rated joints
Delivery method
Survey movement and gap dimensions at concrete interfaces and adjacent partitions. Install the specified backing and sealant to the tested joint configuration.
Quality control
Record gap range, movement capability, substrate condition, material batch and complete seal continuity.

04 · Fire protection at structural interfaces
Delivery method
Coordinate specialist protection at beams, columns and service zones with access for other trades. Apply only the project-approved build-up.
Quality control
Check thickness, continuity, fixings, protected areas and documented system classification.
The illustrations show application concepts. The approved project design and selected system govern execution.